Materials delivered to the stores are stored separately with tags which shows material description, job no. and quantity, so that it can be easily identified by site personnel and to ensure that correct material is installed. Circuit in the distribution board / junction boxes will be suitably identified during installation by Site Supervisor.
Once materials are delivered to the stores, it will be checked against LPO, Delivery Order and physically verified to conform the quality and quantity of materials.
Further all deviations in respect of quantities, conditions and requirements other than the one specified in purchase order like losses, damages, overall shortages not as per the order shall be noted.
A detailed inspection will be performed of all materials received and installed at the job site, by the site supervisor in order to assure that only acceptable items are used.
All the installation performance shall be checked and recorded in Inspection Records pertaining to that circuit operation.
Periodic inspections will be carried out in between each phases of installation.
An overall pre-commissioning test will be carried out in the presence of authorized Personnel and the reports shall be maintained.